1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
|
------------------------------------------------------------------------------
-- --
-- GNAT RUN-TIME LIBRARY (GNARL) COMPONENTS --
-- --
-- A D A . C A L E N D A R . D E L A Y S --
-- --
-- B o d y --
-- --
-- Copyright (C) 1991-1994, Florida State University --
-- Copyright (C) 1995-2008, AdaCore --
-- --
-- GNARL is free software; you can redistribute it and/or modify it under --
-- terms of the GNU General Public License as published by the Free Soft- --
-- ware Foundation; either version 2, or (at your option) any later ver- --
-- sion. GNARL is distributed in the hope that it will be useful, but WITH- --
-- OUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY --
-- or FITNESS FOR A PARTICULAR PURPOSE. See the GNU General Public License --
-- for more details. You should have received a copy of the GNU General --
-- Public License distributed with GNARL; see file COPYING. If not, write --
-- to the Free Software Foundation, 51 Franklin Street, Fifth Floor, --
-- Boston, MA 02110-1301, USA. --
-- --
-- As a special exception, if other files instantiate generics from this --
-- unit, or you link this unit with other files to produce an executable, --
-- this unit does not by itself cause the resulting executable to be --
-- covered by the GNU General Public License. This exception does not --
-- however invalidate any other reasons why the executable file might be --
-- covered by the GNU Public License. --
-- --
-- GNARL was developed by the GNARL team at Florida State University. --
-- Extensive contributions were provided by Ada Core Technologies, Inc. --
-- --
------------------------------------------------------------------------------
with System.OS_Primitives;
with System.Soft_Links;
with System.Traces;
with System.Parameters;
package body Ada.Calendar.Delays is
package OSP renames System.OS_Primitives;
package SSL renames System.Soft_Links;
use type SSL.Timed_Delay_Call;
use System.Traces;
-- Earlier, System.Time_Operations was used to implement the following
-- operations. The idea was to avoid sucking in the tasking packages. This
-- did not work. Logically, we can't have it both ways. There is no way to
-- implement time delays that will have correct task semantics without
-- reference to the tasking run-time system. To achieve this goal, we now
-- use soft links.
-----------------------
-- Local Subprograms --
-----------------------
procedure Timed_Delay_NT (Time : Duration; Mode : Integer);
-- Timed delay procedure used when no tasking is active
---------------
-- Delay_For --
---------------
procedure Delay_For (D : Duration) is
begin
if System.Parameters.Runtime_Traces then
Send_Trace_Info (W_Delay, D);
end if;
SSL.Timed_Delay.all (Duration'Min (D, OSP.Max_Sensible_Delay),
OSP.Relative);
if System.Parameters.Runtime_Traces then
Send_Trace_Info (M_Delay, D);
end if;
end Delay_For;
-----------------
-- Delay_Until --
-----------------
procedure Delay_Until (T : Time) is
D : constant Duration := To_Duration (T);
begin
if System.Parameters.Runtime_Traces then
Send_Trace_Info (WU_Delay, D);
end if;
SSL.Timed_Delay.all (D, OSP.Absolute_Calendar);
if System.Parameters.Runtime_Traces then
Send_Trace_Info (M_Delay, D);
end if;
end Delay_Until;
--------------------
-- Timed_Delay_NT --
--------------------
procedure Timed_Delay_NT (Time : Duration; Mode : Integer) is
begin
OSP.Timed_Delay (Time, Mode);
end Timed_Delay_NT;
-----------------
-- To_Duration --
-----------------
function To_Duration (T : Time) return Duration is
begin
-- Since time has multiple representations on different platforms, a
-- target independent operation in Ada.Calendar is used to perform
-- this conversion.
return Delay_Operations.To_Duration (T);
end To_Duration;
begin
-- Set up the Timed_Delay soft link to the non tasking version if it has
-- not been already set. If tasking is present, Timed_Delay has already set
-- this soft link, or this will be overridden during the elaboration of
-- System.Tasking.Initialization
if SSL.Timed_Delay = null then
SSL.Timed_Delay := Timed_Delay_NT'Access;
end if;
end Ada.Calendar.Delays;
|