1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
|
-- C930001.A
--
-- Grant of Unlimited Rights
--
-- Under contracts F33600-87-D-0337, F33600-84-D-0280, MDA903-79-C-0687,
-- F08630-91-C-0015, and DCA100-97-D-0025, the U.S. Government obtained
-- unlimited rights in the software and documentation contained herein.
-- Unlimited rights are defined in DFAR 252.227-7013(a)(19). By making
-- this public release, the Government intends to confer upon all
-- recipients unlimited rights equal to those held by the Government.
-- These rights include rights to use, duplicate, release or disclose the
-- released technical data and computer software in whole or in part, in
-- any manner and for any purpose whatsoever, and to have or permit others
-- to do so.
--
-- DISCLAIMER
--
-- ALL MATERIALS OR INFORMATION HEREIN RELEASED, MADE AVAILABLE OR
-- DISCLOSED ARE AS IS. THE GOVERNMENT MAKES NO EXPRESS OR IMPLIED
-- WARRANTY AS TO ANY MATTER WHATSOEVER, INCLUDING THE CONDITIONS OF THE
-- SOFTWARE, DOCUMENTATION OR OTHER INFORMATION RELEASED, MADE AVAILABLE
-- OR DISCLOSED, OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A
-- PARTICULAR PURPOSE OF SAID MATERIAL.
--*
--
-- TEST OBJECTIVE:
-- Check when a dependent task and its master both
-- terminate as a result of a terminate alternative that
-- finalization is performed and that the finalization is
-- performed in the proper order.
--
-- TEST DESCRIPTION:
-- A controlled type with finalization is used to determine
-- the order in which finalization occurs. The finalization
-- procedure records the identity of the object being
-- finalized.
-- Two tasks, one nested inside the other, both contain
-- objects of the above finalization type. These tasks
-- cooperatively terminate so the termination and finalization
-- order can be noted.
--
--
-- CHANGE HISTORY:
-- 08 Jan 96 SAIC ACVC 2.1
-- 09 May 96 SAIC Addressed Reviewer comments.
--
--!
with Ada.Finalization;
package C930001_0 is
Verbose : constant Boolean := False;
type Ids is range 0..10;
Finalization_Order : array (Ids) of Ids := (Ids => 0);
Finalization_Cnt : Ids := 0;
protected Note is
-- serializes concurrent access to Finalization_* above
procedure Done (Id : Ids);
end Note;
-- Objects of the following type are used to note the order in
-- which finalization occurs.
type Has_Finalization is new Ada.Finalization.Limited_Controlled with
record
Id : Ids;
end record;
procedure Finalize (Object : in out Has_Finalization);
end C930001_0;
with Report;
package body C930001_0 is
protected body Note is
procedure Done (Id : Ids) is
begin
Finalization_Cnt := Finalization_Cnt + 1;
Finalization_Order (Finalization_Cnt) := Id;
end Done;
end Note;
procedure Finalize (Object : in out Has_Finalization) is
begin
Note.Done (Object.Id);
if Verbose then
Report.Comment ("in Finalize for" & Ids'Image (Object.Id));
end if;
end Finalize;
end C930001_0;
with Report;
with ImpDef;
with C930001_0; use C930001_0;
procedure C930001 is
begin
Report.Test ("C930001", "Check that dependent tasks are terminated" &
" before the remaining finalization");
declare
task Level_1;
task body Level_1 is
V1a : C930001_0.Has_Finalization; -------> 4
task Level_2 is
entry Not_Taken;
end Level_2;
task body Level_2 is
V2 : C930001_0.Has_Finalization; -------> 2
begin
V2.Id := 2;
C930001_0.Note.Done (1); -------> 1
select
accept Not_Taken;
or
terminate;
-- cooperative termination at this point of
-- both tasks
end select;
end Level_2;
-- 7.6.1(11) requires that V1b be finalized before V1a
V1b : C930001_0.Has_Finalization; -------> 3
begin
V1a.Id := 4;
V1b.Id := 3;
end Level_1;
begin -- declare
while not Level_1'Terminated loop
delay ImpDef.Switch_To_New_Task;
end loop;
C930001_0.Note.Done (5); -------> 5
-- now check the order
for I in Ids range 1..5 loop
if Verbose then
Report.Comment (Ids'Image (I) &
Ids'Image (Finalization_Order (I)));
end if;
if Finalization_Order (I) /= I then
Report.Failed ("Finalization occurred out of order" &
" expected:" &
Ids'Image (I) &
" actual:" &
Ids'Image (Finalization_Order (I)));
end if;
end loop;
end;
Report.Result;
end C930001;
|